InfrastructureSecurity
News 0 of 23

Zojila Tunnel: World's Longest High-Altitude Tunnel (13.14 km) at 11,578 ft Achieves Breakthrough, Ensures All-Weather Ladakh Connectivity

Target:UPSCMPSCTeachingPrelims HighMains Medium
13 Jun 2026
~2 min
Source: The Hindu
Key Data:13.14 km11,578 feet₹6,800 croreJune 9, 20264-6 months
Bodies:Ministry of Road Transport and Highways
Practice MCQs from today's news ▸
What This Article Covers

1.The 13.14 km Zojila tunnel, built at ₹6,800 crore, achieved breakthrough on June 9, 2026, ensuring all-weather connectivity between Kashmir and Ladakh.

2.It is a strategic game-changer for military mobility along the Line of Actual Control (LAC) and Line of Control (LOC), addressing historical logistical delays.

3.The tunnel ends the winter isolation of Ladakh, promising economic benefits through year-round movement of goods and people, and boosting adventure tourism in Drass.

The Big Picture
Prelims · HighMains · Medium

The Zojila tunnel, the world's longest high-altitude tunnel at 13.14 km, has achieved a breakthrough, marking a strategic and infrastructural milestone. It provides all-weather connectivity between Kashmir Valley and Ladakh, overcoming a formidable Himalayan pass that remained closed for 4-6 months annually, impacting both civilian life and military logistics.

Exam Lens

Quick Exam Facts From News

Tunnel Length13.14 km
Altitude11,578 feet
Project Cost₹6,800 crore
Breakthrough DateJune 9, 2026
Winter Closure Duration4-6 months

1-Minute Revision

  • Tunnel Length: 13.14 km
  • Altitude: 11,578 feet
  • Target this Data: 13.14 km length at 11,578 ft altitude, built for ₹6,800 crore.
  • Target this Nodal Body: Ministry of Road Transport and Highways (MoRTH).
  • Target this Geographical Point: Connects Sonamarg (Baltal) in Kashmir to Meenamarg (Drass) in Ladakh.

Mastered this topic? Test your knowledge with a full MCQ quiz.

Practice exam-style questions, track your score, and strengthen your recall.

1Static LinkageEasy

The Zojila Tunnel project falls under the purview of which Union Ministry?

2Statement-basedHard

Consider the following statements regarding the Zojila Tunnel:

1. It is the world's longest high-altitude tunnel, spanning 13.14 kilometres.

2. The tunnel connects the Sonamarg region in Ladakh to the Meenamarg region in Kashmir.

3. It is expected to remain open for traffic throughout the year, ending seasonal closure of the Zojila Pass.

Which of the statements given above is/are correct?

3Data-centricMedium

As mentioned in the article, what is the total project cost of the Zojila Tunnel?

4Application/ImpactMedium

What is described as the primary strategic significance of the Zojila Tunnel in the article?

All 25 MCQs ▸
You finished this topic
Explore Related Topics
Related Current Affairs
Infrastructure Current Affairs

Zojila Tunnel Breakthrough: 13.153-km All-Weather Route to Connect Kashmir & Ladakh at ₹6,808.69 Cr

A critical breakthrough in the Zojila Tunnel project now connects the two ends of a 13.153-km passage that will provide all-weather road connectivity between Kashmir and Ladakh. This strategic infrastructure, at an altitude of 11,578 feet, aims to bypass the snow-bound Zojila Pass and is expected to be a lifeline for the region, impacting security, tourism, and the local economy.

Infrastructure Current Affairs

Zojila Tunnel Breakthrough: World's Longest Single-Tube Bidirectional Road Tunnel (13.14 km) at 11,578 ft Operational by 2028

The final breakthrough of the strategically vital Zojila Tunnel marks a critical infrastructure milestone for India. This all-weather link between Ladakh and Kashmir, costing ₹6,800 crore, enhances national security by ensuring year-round military mobility and promises socio-economic transformation for the region, reducing travel time from 2 hours to 30-40 minutes.

Infrastructure Current Affairs

Zojila Tunnel Breakthrough: India's 13.153 km Longest Road Tunnel Achieves All-Weather Ladakh-Kashmir Connectivity Target for 2028

A breakthrough blast has completed the main excavation for India's longest road tunnel, the 13.153 km Zojila Tunnel, six months ahead of schedule. This strategic infrastructure project aims to provide year-round connectivity between Ladakh and Kashmir, cutting travel time from over an hour to 15 minutes, with full public opening targeted for February 2028.

Infrastructure Current Affairs

Zojila Tunnel: India's 13.14 km All-Weather Strategic Tunnel in Seismic Zone IV Completes Breakthrough

The Zojila Tunnel, a critical ₹6,800 crore strategic infrastructure project in Ladakh, has achieved its final breakthrough. It will provide year-round connectivity to a sensitive border region, drastically reducing travel time and enhancing military logistics, which is crucial for national security and regional development.

Infrastructure Current Affairs

Zojila Tunnel, India's Longest (14.15 km) & Asia's Longest Bi-Directional Road Tunnel, Nears Completion With ₹6,500 Cr Investment

The strategic Zojila Tunnel project, crucial for year-round connectivity between Jammu & Kashmir and Ladakh, has achieved a major breakthrough. This 14.15 km tunnel, being built at an elevation of 11,578 feet with an investment of ₹6,500 crore, will cut travel time from 3 hours to 20 minutes and is a vital exam topic for infrastructure, national security, and regional development.

Infrastructure Current Affairs

13.14 km Zojila Tunnel Breakthrough at 11,578 ft, Cost ₹6,800 Cr Under NHIDCL for All-weather Ladakh Connectivity

The breakthrough of the 13.14 km Zojila tunnel, built at a cost of ₹6,800 crore, marks a critical infrastructure milestone for Ladakh. It will provide year-round connectivity between Jammu-Kashmir and Ladakh, drastically reducing travel time and bolstering strategic military logistics.

Infrastructure Current Affairs

₹6,800 Cr Zojila Tunnel Breakthrough Achieved Using NATM, Targets 2028 Completion for Ladakh All-Weather Connectivity

The Zojila tunnel, India's strategic high-altitude infrastructure project, has achieved a construction breakthrough. This 13-km tunnel will provide year-round connectivity between Kashmir and Ladakh, ending the region's winter isolation and bolstering military mobility along the sensitive LAC and LOC.

Infrastructure Current Affairs

NHIDCL Achieves Breakthrough for 14-km Zojila Tunnel on NH-01, ₹7,000 Cr Project to Provide All-Weather Ladakh Connectivity by 2028

The breakthrough of the Zojila tunnel marks a critical milestone in India's strategic infrastructure push in Jammu & Kashmir and Ladakh. This project, part of a ₹7,000 crore investment, will provide all-weather connectivity, cutting travel time by half and serving as a lifeline for Ladakh, which remains cut off for six months during winter.